skip to main content

I want to...

Current filter:

Temporary road closure of SH51 Waitangi Bridge Clive Wednesday 26 April to Thursday 27 April for bridge repairs.

Published: 24 April 2023

SH51 Bridge Inspections Wednesday 27 April 2023.

8pm, Wednesday 26 April to 5am, Thursday 27 April

  • Due to bridge inspections, the SH51 Waitangi Bridge will be closed in both directions on Wednesday, 26 April 2023 from 8:00 p.m. to Thursday, 27 April 2023 5:00 a.m.
  • Local detours will be in place for traffic.
  • VMS boards will be in place advising the public of the closure date and times.
  • Plan your journey accordingly allowing extra time for travel.
  • Please note that these works are weather dependent so may be postponed or extended at short notice.

Back to Road Works

Loading...

Napier City Council - Copyright © 2024 Napier City Council

Disclaimers and Copyright
While every endeavour has been taken by the Napier City Council to ensure that the information on this website is accurate and up to date, Napier City Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Napier City Council cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Napier City Council - www.napier.govt.nz / +64 6 835 7579 / info@napier.govt.nz