skip to main content

I want to...

Current filter:

Greenmeadows wastewater pump station works coming up Saturday 4 November.

Published: 1 November 2023

028

On Saturday 4 November from 9am, we are doing some important work on the Greenmeadows wastewater pump station in Gloucester Street. This means we will need to turn off the water in this area for up to three hours. Some households on Kennedy Road may be affected.

Occasionally, when the water comes back on it may be discoloured. If this happens, turn on the cold tap and leave it running until the water runs clear. This will flush the line and the water will return to normal. If the water doesn’t run clear after ten minutes, please call us on 06 835 7579.

The works on the wastewater pump station are weather dependent. If the weather is unsuitable to get the work done, we will postpone until the next dry Saturday.

Back to News Archive

Napier City Council - Copyright © 2024 Napier City Council

Disclaimers and Copyright
While every endeavour has been taken by the Napier City Council to ensure that the information on this website is accurate and up to date, Napier City Council shall not be liable for any loss suffered through the use, directly or indirectly, of information on this website. Information contained has been assembled in good faith. Some of the information available in this site is from the New Zealand Public domain and supplied by relevant government agencies. Napier City Council cannot accept any liability for its accuracy or content. Portions of the information and material on this site, including data, pages, documents, online graphics and images are protected by copyright, unless specifically notified to the contrary. Externally sourced information or material is copyright to the respective provider.

© Napier City Council - www.napier.govt.nz / +64 6 835 7579 / info@napier.govt.nz